Gauge Installation on a Gen 2 Dodge Cummins

Run all of your wires and tubing through the holes you drilled in the factory pillar and snap the factory pillar in to place.  Next place the gauge mount up against the factory pillar.  Make sure that all wires and tubing are through their respective gauge holes.  Attach the gauge mount with the supplied push pins.